胖小咪咪
线内测试:有两种一种是加In ,一个不加In,还是用加的比较好,In-line test成品放置区:Finished Product Area物料暂放区:Material temporarily placed area如果简单的物料区用:Material Area如果非要加”暂时“那么用:Temporary Material Area有机溶剂作业区:Working Area with Organic Solvent、接地阻抗:Ground Bond耐压测试:Pressure test 如果是电压的话用:Withstanding Voltage Test如果是压力承受的话用:Compression Test希望可以帮到你
快乐齐分享yeah
In-line testing, product placement area, the material temporarily placed area, organic solvent work area, ground impedance, pressure testing,