• 回答数

    2

  • 浏览数

    115

z小九z5858564
首页 > 英语培训 > 整机调试英文

2个回答 默认排序
  • 默认排序
  • 按时间排序

青笋丝爱吃榴莲

已采纳

iPhone 的主界面上应该有个 Settings(设置),单击后进入设置菜单;然后单击 General(通用)进入系统设置界面;再单击 International(多语言环境)进入多语言设置界面;再单击 Language(语言)进入界面语言选择设置;单击“简体中文”,再单击屏幕右上角的 Done(完成),等一段时间就变成中文界面了。

整机调试英文

243 评论(13)

舜井街的猫

First, check the parts before installation is complete: the host beam, left and right side Liangzong Cheng, table board assembly, tool kit Second, the whole machine installation: (1) table plate placed in the middle of the machine to be installed. Measuring the center distance is based Shui Nidun consistent with the drawings. (2) left and right side beams onto the base Shuini Dun, the use of transparent pipes into the water, measuring the level of left and right side high beam. First left and the right side of the beam to take maximum points to the left and the right beam of the highest point of reference, through the edge beam adjusting screw to adjust left and right side beams, respectively, before, the diagonal points of the level of high and consistent reference point. (3) beam with a tape measure round two vertical line spacing box, and then the first measurement of left and right side beams, end of the diagonal to make two diagonal dimensions are equal. Adjust the left and right side of both ends of beam center distance, center distance of 0.5 mm in size within the error control. (4) dust cloth installation: the dust cloth box's bottom line from the vertical nylon rod wheel and the middle of penetration, vertical box from the inside through the nylon rod, and then the other side of the box from the vertical line and nylon round bar the middle of piercing. (5) lifting beam host: the towline towline beam into the right groove to align the beam line round edge beam rails, beams and measuring the size of the left front beam and then measuring beam and the right side of the front beam size, so that the two side beams and the beams around the front of the same size, then placed in the left side of the beam beams. Confirm correct position of each part after the adjustment of the left and right side beams and foundation bolts Shui Nidun the embedded iron welding firm. (6) Installation towline: the towline and tow tank bolted, check the slot from the towline traversing each wire and the access to the corresponding position, respectively, the main power line through the tow tank and electronic control box connected. Beams, respectively, left and right side beams add oil, as the manual fuel injection pump for the hydraulic station hydraulic oil tank, cover and dust cloth, dust cover, the first compression plate dust cloth with front-end, to the side beams back pressure tight. (7) Table board of adjustment methods: the blade edges were walking to the platform board 4 points, were measured platen 4 corners and the vertical size of the saw blade, adjust the table plate and seat adjustment bolt to 4 a corner point and the distance between the saw blade will be adjusted in line with the platen bolts welded firmly embedded horn. (8) with a manual operation mode and planed boards in a line on the saw, the infrared laser instrument calibration.

357 评论(13)

相关问答