cynthia20056
检验报告,Inspection report产品名称,Name of product生产单位,manufacturer委托单位,Consigner检验类别,Classification of inspection委托检验,Entrusted inspection机电有限公司,Electromechanical Company LTD.抽(送)样日期,Date of sampling and delivering.样品数量,Quantity of sample样品到达日期,Arrival date of sample抽(送)样人员,Sampler and deliverer抽样基数,Sampling basic number检查封样人员,Inspector for sealing sample样品编号,Sample number生产日期/批号,Manufacturing date / Batch number检测地点,Place of detection本中心内燃机检测室,internal-combustion engine inspection room of the Center检测日期,Date of detection检验依据,Inspection basis检验结论,Inspection conclusion样机信息,Information of the prototype检测情况,Detection situation检测条件,Detection conditions主要检验仪器设备,Main instruments and equipment of inspection仪器编号,Instrument number检验概况,General situation of inspection检验结果,Inspection results注:生产单位用manufacturer,不用unit,manufacturing unit是中国英语,老外不懂什么叫生产单位,还以为是什么计量单位呢。机电有限公司 有专门词汇:Electromechanical Company LTD.本中心要加 the, center要大写: Center生产日期不叫Production date, 叫manufacturing date等等,不一而足。

茵为有你
Inspection reports, product name, production, commissioned by unit type, commissioned testing, Electrical and Mechanical Co., Ltd., pump (delivery) like the date, sample number, date of sample arrival, pump (delivery)-like staff, a sample base, check the seal-like staff sample number, production date / batch number, test location, the Center for the internal combustion engine testing rooms, testing dates, test basis, test conclusions, prototype information, testing situation, testing conditions, the major test equipment, apparatus number, test profiles, test results ,
头头的奋斗
委托单位 Client 生产单位 Productive unit 受检单位 Inspected unit 抽样者 Sampling 抽样地点 Sampling location 抽样基数 Basic number for sampling 送样者 Sample submittal 送样基数 Basic number for Sample presentation 送样日期 Date of Sample presentation 有些是自己翻译的 你可以参考一下 谢谢
优质英语培训问答知识库