叽叽咕咕喳喳
Construction personnel need to be responsible for the field level and surface soil smooth drainage. Construction personnel shall verify the elevation of all large place, and in construction and drawings before comes into play in the design of contradiction to landscape architect and part of civic engineers put forward to attract attention.Construction personnel need to be responsible for the field level and surface soil smooth drainage. Construction personnel shall verify the elevation of all large place, and in construction and drawings before comes into play in the design of contradiction to landscape architect and part of civic engineers put forward to attract attention.
么么哒ALICE
用了很多时间才翻译了出来,希望对你会有助。1、 施工人员需要负责场地内的土体平整和地表排水通畅。施工人员应核实场地中所有高差较大的地点,并在进场施工前将与图纸设计中的矛盾部分向景观设计师和市政工程师提出以引起注意。1, Construction workers must be responsible for a smooth surface and well drained site. Construction workers should verify those locations with large height difference, also before enter and start working on the site, all parts of contradictions in the design drawings must be put forward to the landscape architects and city engineer department, in order to attract their attention.2、路表竖向,道路剖面,雨水口和道牙顶部竖向标高参照市政工程图纸,在施工图上标注的道牙顶部标高仅供参考。2. Vertical road surface, section of road, gullies and elevation at the top vertical of road teeth are referring to the municipal engineering drawings. Top elevation of road teeth marked on the construction drawings are for reference only.3、图纸上土坡的形式和位置仅为示意,其堆砌后的形状应由景观设计师进行检查并认可。3 The form and position of the slopes on the drawings is only an indication. its shape after piling up should be inspected and recognized by the landscape architects.4、施工人员应该将施工过程中产生的垃圾碎片及时移走4, Construction workers should timely remove of all waste debris, which were generated during the course of construction.5、雨水口,排水沟,种植池排水孔和有孔排水管线需要与市政雨水系统相连接的,参照市政工程平面图。5, Gullies, drainage ditches, planting pool drainage holes and the drain pipes with holes must need to be connected with the municipal storm-water system, referring to the plan of municipal engineering.6、所有的雨水口和排水沟需要通畅无阻,易于维护并在施工完毕后能够正常工作6, All of the gullies and drainage ditches must be kept clear and free flowing, easy to maintain and will work properly after the completion of construction.7、 施工员将种植区表面200mm厚的土层进行疏松,进行土壤改造。现场土壤应由专业的土壤研究室进行研究,并根据土壤可持续性研究报告进行改造。7 The construction workers should loosen up and improve the soil with 200 mm thickness of the planting area and under go soil transformation. On site soil research should be carried out by professional soil laboratory, and transformation should base on the soil sustainability study.8、根据土壤结构报告来选用土壤类型,设定竖向改造进程,土壤夯实度,限定最大坡度,平面地基材料的选择等8, The selection of soil type should be according to the soil structure, setting the vertical transformation process, the soil compaction degree, to limit the maximum slope ratio, flat surface foundation material selections and so on.9、铺装路面典型最大坡度为2%。种植区域最小坡度为3%。在场地竖向施工过程中如遇到任何与现场地形产生冲突的设计应及时与景观设计师沟通9, The typical maximum gradient of the road pavement would be 2%. The planting area with minimum slope of 3%. If vertical site construction process met with any conflict with the on site terrain design should consult with the landscape architect immediately.10、在坡度大于1:2的地方需用可生物降解的土工织物来防止水土流失10, Where the slope ratio is greater than 1:2 must need to use biodegradable geo-textile to prevent soil erosion11、竖向设计应遵守当地的规范和标准。洼地距离所有的构筑物至少1.2米远.土地的竖向设计应该具有连续性和统一性11, The vertical design shall comply with local codes and standards. Depressions distance of all structures must be at least 1.2 meters. The vertical design of the land should have a continuity and uniformity.
康夫君和小静
Construction personnel need to be responsible for the field level and surface soil smooth drainage. Construction personnel shall verify the elevation of all large place, and in construction and drawings before comes into play in the design of contradiction to landscape architect and part of civic engineers put forward to attract attention.
rachelkong
dale[deil]基本翻译n.山谷;排水孔网络释义Dale:黛儿英国居住在丘陵间之山谷中者|水槽排水孔|宽谷DaleOrr:经济师奥尔|经济学家奥尔|董事奥尔DaleFord:福特Lillian基本翻译n.莉莲(女子名,等于Lilian)网络释义Lillian:上帝的誓约|希腊一朵百合花,代表纯洁|百合花盛放LillianGlass:利丽安·格莱斯|葛拉斯LillianMalt:理连·莫尔特joy[dʒɔi]基本翻译n.欢乐,快乐;乐趣;高兴vi.欣喜,欢喜vt.高兴,使快乐网络释义Joy:快乐|乔伊拉丁欣喜|乔伊JoyDivision:欢乐的分离|快乐分裂|快乐小分队Joyride:快乐飞奔|驾车兜风|致命玩笑