• 回答数

    4

  • 浏览数

    105

Kiwi琪薇
首页 > 英语培训 > 总体要求英文

4个回答 默认排序
  • 默认排序
  • 按时间排序

杜拉拉candy

已采纳

写作总体要求:(1)说明论文的主题、范围和目的。(2)说明本研究的起因、背景及相关领域简要历史回顾(前人做了哪些工作?哪些尚未解决?目前进展到何种程度?等)。(3)预期结果或本研究意义。(4)引言一般不分段,长短视论文内容而定,涉及基础研究的论文引言较长,临床病例分析宜短。写作禁忌1)文不着题,泛泛而谈。2)引文罗列,缺少分析和概括。注意事项古代文论中有“凤头、猪肚、豹尾”之称。虽然论文不强调文章开头象凤头那样俊美、精采、引人入胜,但引言是给读者的第一印象,对全文有提纲挈领作用,不可等闲视之。

总体要求英文

166 评论(9)

越狱找食吃

新闻热词:“总体规划” 英语可以这样表达:News hot words: "master plan"Hot news words: "overall planningHot news words: "the overall planningHot news words: overall planning

192 评论(10)

难得明白

general plan 望采纳

123 评论(10)

樱桃大丸子子

Nine, electrical control system1, the overall requirementsA, electrical control using zoning of centralized control mode, namely before treatment, paint, set catenary, electrophoresis, and after washing and drying cabinet curing controller, etc.B: a power distribution, by users, secondary distribution is responsible by the supplier.C, electrophoresis with all the electrical control cabinet, stop switch. / state indicator.D: when the alarm functions, system in operation process, once appear abnormal condition, alarm system, and to start automatically acousto-optic form hint on site working staff which equipment malfunction, then guide.E, all operating position with tight stop button, guarantee in emergency, emergency stop all work, prevent serious accidents occur.F, other did not meet the new national standard that place.2 and the concrete implementation mode controlA, electrophoresis, and after rinse cabinet: electrophoresis silicon rectifier voltage isolator, three-phase 380V input. Rectifier voltage output: DC 250V 0-0, current DC 250A adjustable.B, catenary conveying system and power lines and spray cabinet: control circuit apart installation, all operating location has stopped/button, catenary line running newspaper alarm set.C, drying cabinet for the temperature control, drying furnace temperature (such as the temperature of measuring and controlling function, drying furnace temperature control accuracy ± 5 ° c. After unloading and temperature of motor, audio, finded light alarm functions, can be found fault handling.3 and reliability measures1), adopts advanced technology.2), the key points of the temperature sensor adopts prepared. Quantity3), a full set of equipment, electrical components selection of domestic manufacturers. Fixed-pointTwelve, coating line installation acceptance requirements(1), pretreatment devices1 the view: the structure and appearance consistent, no mechanical bruising, smooth, colour and lustre is uniform.2 A: sex can satisfy requirement of advanced technology, craft parameter, reasonable structure, convenient maintenance, emission reaches the national standards.B. the spray pump, stable filters etc.C. the Chambers, tub, piping and equipment all system without leakage.D. equipment operation 85dB acuities noise.(2), drying oven1 the view: smooth, colour and lustre is uniform.2 A: sex can satisfy equipment parameters requirements.B. temperature controlled, adjustable, automatic constant.C. workpiece, temperature drying not more than 5 degrees Celsius (±.D. heating system USES natural gas heating.E. insulation USES density for 100Kg/m3 quality cotton, insulation thickness is 150mm.(3) paint spraying system1 the view: the reasonable structure, close to beat, overall, no mechanical bruising, colour and lustre is uniform.2 A: sex can satisfy equipment parameters requirements.B. mist processing system stable operation.C. equipment operation 85dB acuities noise.(4) flow flat room1 the view: the reasonable structure, compact, the overall level, no mechanical bruising, colour and lustre uniform.2 A: sex can satisfy equipment parameters requirements.B. coping with exhaust emissions.(5) cathode electrophoresis system1 the view: the reasonable structure, compact, the overall level, no mechanical bruising, colour and lustre uniform.2 A: sex can satisfy equipment parameters requirements.B. electrophoresis paint, coating thickness superior equipment.C. equipment operation 85dB acuities noise.(6) suspension conveyor chains1 the view: the standard type, XT100 appearance, color according to regulations.2 A: sex can run speed range, meet the technological requirements for 0.5-2.5 m/min, satisfy the production line.B. catenary runs smoothly, without any crawling jitter phenomenon.(7) electrical control systemSpecifically, the detailed rules for the implementation of the project and the inspection in accordance with the electric control system design requirements.(8) the acceptance of the coating related standard reference industries and enterprises, to meet customer requirements.14 and coating technology service and after-sales service content and measures (limited domestic)1 party a and party b is responsible for provide instructions and related software material.2 for one year, warranty, product, product components during the warranty period if quality problems, if party a, party b is responsible for repair kit for responsibility.3, visit user, site equipment related matters.4 party b to provide technical guidance services. The equipment,5 party b for user training coating line, on-job operators can master trainers, adjustment and the basic operation maintenance ability.希望对你有帮助

227 评论(12)

相关问答