• 回答数

    5

  • 浏览数

    300

结婚201314
首页 > 英语培训 > 工程检查英文

5个回答 默认排序
  • 默认排序
  • 按时间排序

糊糊1011

已采纳

检查的英文名称为Check, 定义为为验证航空器其功能是否符合经批准的标准而进行的工作。 所属学科为航空科技(一级学科) ;航空器维修工程(二级学科)。中文名检查外文名Check拼音jiǎnchá意义为了发现问题而用心查看作用查找问题和缺陷简介拼音:jiǎnchá英文:【Examine;Check;Inspect;Review】解释:①为了发现问题而用心查看:~身体ㄧ~工作。例句:我们要定期去医院检查身体。②翻检查考(书籍、文件等)。例句:领导来我们学校检查学生作业情况。③检讨 ①:口头~ㄧ犯了错误要做~。例句:小明被老师罚写200字检查。查看;查考首先检查你自己的良心【self-criticism】:检讨

工程检查英文

324 评论(13)

lostinyoudaidai

1 project quality assurance system 2 Organization guarantee 3 quality management agencies 4 project manager 5 project manager 6 Chief Engineer 7 business manager 8 Ministers of departments 9 heads 10 work every quality inspector 11 work guaranteed 12 construction preparation phase 13 select the aggregate of all kinds of technical staff 14 submitted project schedules, real-time construction organization plan Raw materials and semi-finished products for the 15 projects of quality inspection 16 construction machinery and equipment, as well as the quality and performance 17 temporary works, construction and environmental quality control 18 construction phase 19 construction quality assurance measures to give the low-down 20 construction process quality control 21 intermediate products quality control 22 project quality post control Quality control process over 23 Completion stage 24 25 completed documentation and completion of quality post 26 engineering acceptance and owners issued traffic certification 27 defect liability period 28 on the defects, defects or other nonconformity of the repair, reconstruction and modify 29 system guarantee 30 quality responsibility 31 started reporting and approval system 32 design document and approval system 33 double checked composite system measurement 34 engineering test system 35-phased technology gives the low-down 36 concealed work check visa system 37 quality assessment, custom 38 completed quality visa system 39 regularly and daily quality inspection system 40 accident reporting system

86 评论(9)

EatDrinkWorld

1. project quality guarantee system3. quality control agent 4. project manager5. project sub-manager6.chief engineer8. all the ministers or ministers in every department 9. all the group leaders11. construction in prepare18. be under construction

98 评论(12)

hdgjcxsgbjj

检查,只是查看一下你做的监察,是监视并查看的督察,是督促你,并观察

109 评论(12)

花usahana兔

Asking one engineer to check it.

158 评论(10)

相关问答