zhuhuals2008
保留的英文:reserve
词汇解析
reserve
英 [rɪ'zɜːv] 美 [rɪ'zɝv]
n. 储备,储存;预备队;缄默
vt. 储备;预约;保留
vi. 预订
例:She told me all about it without reserve.
她毫无保留地告诉了我有关此事的一切。
例:A double room with a balcony overlooking the sea had been reserved for him.
一个带一座阳台的海景双人间已被预留给他了。
扩展资料
近义词
1、store
英 [stɔː] 美 [stɔr]
n. 商店;保留;储备,贮藏;仓库
vt. 贮藏,储存
例:I handed over my secret store of chocolate.
我交出了我偷偷藏起来的巧克力。
2、repertory
英 ['repət(ə)rɪ];美 ['rɛpɚtɔri]
n. 储备;仓库;全部剧目
例:In fact, the poetic repertory often draws on dialects from different parts of the country.
事实上,这一诗歌的宝库是根据各地方言略有不同的。
伯符仲謀
1.if the driver drinks before driving his judgment will be weakened when the accident happens2.could you tell me the historical backgroud of the world war I3.you must take every chance to communicate with others if you want to improve your oral English4.special ceremomies are held every year in our country to honor the outstanding scientists5.we should prevent the children from mistaking the pills for choclatewe can avoid many accidents happening if we are cautious of the electrical equipmentsit's necceassary to set aside for reviewing what you have learnedyou should first try to overcome the diffculties you confront if you want to succeed
天吃星星蒂小娜
PurposeWith this component, you make a request to the warehouse to keep materials ready for withdrawal at a later date and for a certain purpose. This simplifies and accelerates the goods receipt process.A reservation for goods issue can be requested by various departments for various account assignment objects (such as cost center, order, asset, etc.).FeaturesThe purpose of a reservation is to ensure that a material will be available when it is needed. It also serves to simplify and accelerate the goods issue process and prepare the tasks at the point of goods issue.It is also important that reservations are taken into account by Material Requirements Planning (MRP), which means that required materials are procured in time if they are out of stock.Planning a Goods IssueYou can handle both planned goods issues and unplanned goods issues.You can also use reservations to plan goods receipts and stock transfers (see Planning Goods Receipts and Planning Stock Transfers and Transfer Postings). This section deals only with reservations for goods issues.Information in a ReservationIn a reservation, information is stored that is relevant for the goods issue and for materials planning, for example:What? (which material?)How much? (in which quantity?)When? (for which requirement date?)From where? (from which plant or warehouse?)To where? (to which recipient or customer?)A reservation document consists of a header and at least one item. The header contains general data about the reservation (creator, movement type, account assignment). The items describe individual planned movements (material, quantity, requirement date).You can create a reservation for exactly one purpose only; that is, in a reservation, you can only enter one movement type and one account assignment object (for example, a cost center).Reservation LevelThe system makes reservations at plant or storage-location level. For materials handled in batches, you can also create reservations at batch level.Manual and Automatic ReservationsThe R/3 System supports manual and automatic reservations. Manual reservations are entered directly by the user. Automatic reservations are generated automatically by the R/3 System. There are two types of automatic reservations:Reservations for orders, networks, WBS elements:When an order, a network, or a project is created, the components from the warehouse are reserved automatically.Stock transfer reservations:If reorder point planning is used at storage location level and the available stock on hand falls below the reorder point, the system generates a stock transfer reservation in the plant for the replenishment quantity.You cannot manually process automatic reservations. For example, it is not possible to change reservations for an order directly. You have to change the components in the order. The system then updates the reservation automatically.What are the Results of a Reservation?When a reservation is entered, the following events occur in the system:The system creates a reservation document, which serves as proof of the request.In the material master record, total stock and unrestricted-use stock of the material remain unchanged. Reserved stock is increased by the reserved quantity.In MRP, available stock is reduced by the reserved quantity. This is visible in the current stock/requirements list. The reservation causes an entry to be made in the requirements planning file.Displaying Reserved StockThere are two functions available for displaying reserved stock (also refer to Reporting in Inventory Management ):Stock overview at plant level:When you use this function, the system displays the total reserved stock for the material at plant level. From the stock overview, you can choose Environment ® Reservations to display a list of the reservations for the material.Current stock/requirements list:When you use this function, the system lists all of the open reservations for the material at plant level, along with the reserved quantity for each.
昵称真是醉了
保留= 1. (保存不变) continue to have; persist; retain: 保留实力 preserve one's strength; 他还保留着战争年代的革命朝气。 He still retains the revolutionary fervour of the war years. 这座古建筑还保留着当年的面貌。This ancient building still looks as it did originally. 2. (暂时留着不处理) hold back; keep back; reserve: 保留权利 reserve rights; 持保留意见 have reservations; 无保留地同意 agree unreservedly; agree without reservation ◇保留工资 retained salaries; 保留价格 reserve price; reservation price; 保留剧目 repertory; repertoire; 保留权限 reserved authority; 保留所有权 with retained ownership; 保留物 retention。 有用请采纳
优质英语培训问答知识库