• 回答数

    6

  • 浏览数

    288

素素V587
首页 > 英语培训 > 英文合同调试费

6个回答 默认排序
  • 默认排序
  • 按时间排序

weddinglily

已采纳

服务费用网络释义服务费用:service charge

英文合同调试费

112 评论(8)

大大的蚂蚁啊

Service charge: including installation、commission , traning cost and so on.

226 评论(12)

jjgirl2008

wushan xx bureau 统一称呼education bureauenviroument protecion bureautax bureau

299 评论(14)

Huanglingying

直接写成Charges或Service Charges就可以了。

85 评论(9)

ilovefoood

Installation. Debugging and acceptance 8.1 in the seller of the contract to install equipment. Commissioning. Heat load trial run period, to assume the contract of the equipment installation and commissioning work. The seller of the contract 8.2 Debugger equipment during the period, to assume the contract of equipment debugging equipment work. 8.3 of the contract to install equipment before the start of the month, the seller should proceed to the scene of the Organization of technical guidance service. In the installation of equipment before the start of the 7 working days, the buyer should notify the seller of the service organizations to the scene, the seller will be required to send to the scene of experienced personnel to guide the installation of equipment. Debugging equipment to participate in the contract to install the equipment. Debugging and load Acceptance testing and engineering. 8.4 in the contract to install equipment. Commissioning. Heat load in the process of testing equipment such as the discovery does not comply with the requirements of the contract, the need for rework. Replacement. Supplement, the seller is responsible for conducting free to deal with in a timely manner, the buyer shall provide active support. If the buyer as a result of the failure by the construction of technical information with the relevant provisions and requirements, or the installation of equipment in violation of the technical staff under the guidance of technical information for the guidance of the cause of the accident and the loss by the buyer, the seller but the buyer should actively cooperate with the repair or replacement Damage to equipment and spare parts, costs incurred by the buyer. 8.5 equipment heat load test of the contract after the success of the 5 working days, buyers and sellers should sign the contract equipment heat load test of the success of the memorandum as part of the supplementary contract.

268 评论(13)

君绮罗222

英语合同的特点:专业术语学习:外贸英语之合同很有用的两个网站,已经很够学了。关于国家县一级政府机构各部局的规范性称呼,英语与汉语的差异很大。这些机构在不同的国家有不同的称呼。在美国等一些国家称为独立机构或管制,看一看这个网站有点用的或者行政院 The Executive Yuan of the Republic of China内政部 Ministry of the Interior外交部 Ministry of Foreign Affairs财政部 Ministry of Finance教育部 Ministry of Education法务部 Ministry of Justice经济部 Ministry of Economic Affairs交通部 Ministry of Transportation and Communications蒙藏委员会 Mongolian & Tibetan Affairs Commission侨务委员会 Overseas Chinese Affairs Commission主计处 Brief Introduction to Directorate-General of Budget, Accounting and Statistics人事行政局 Central Personnel Administration新闻局 The Government Information Office卫生署 Department of Health巫山县教育局 Bureau of Education in WuShan巫山县投促局 Bureau of City Investment in WuShan巫山县环保局 Bureau of Environment Protectin ...参考一下。

124 评论(12)

相关问答