• 回答数

    7

  • 浏览数

    196

冰可乐28
首页 > 英语培训 > 报价单安装费英文

7个回答 默认排序
  • 默认排序
  • 按时间排序

玉皇小帝

已采纳

10% 20% % % % 20支付20提前20对% % 2010% 20% % 20订单文件% % 20 20对2050% 20% % 20的好感% % 20资料% 20对20 / % 20设备% 20交货% 20 % % 20每月20进步20% % % 2020% % % 20对20安装% 20 20作品% % 20 progress. 20每月20% % % 2010% % % 20工作20对20完成。

报价单安装费英文

222 评论(8)

粉红猪大大

一,报价范围 Quotation remarks1,以上报价不含土木工程,一次电源,进水及排水工程;The quotation above does not consist of the projects of civil engineering, primary power source, supply and drainage engineering2,买方若需国内发票,则需增加6%税额 If the buyer needs the domestic invoice, 6% of extra tax will be added.二,交货地;Destination of delivery三,交货日期 Date of delivery四,付款条件 The conditions of payment1,定金付总金额40%;40% of the total sum as the earnest in advance 2,货到贵厂付总金额30%; 30% of the total sum should be paid when the cargo arrives at your factory3,安装完成付总金额20%;20% of the total sum should be paid when the installation completes 4,试车验收付总金额10%;10% of the total sum should be paid when trial running, checking and accepting.买方公司盖章签名: The seller's seal and signature卖方公司盖章签名:The buyer's seal and signature

93 评论(11)

小能喵尉哥

The price above including such items as installing accessories, assembling, moving goods from downstairs to the designated rooms. The period of installing 200 sets of cabinets will be 1 year. 16 workers, 1 designer who understands English and 3 porters are needed. Workers verification, round-trip airfare. Insurance. Security. The A trading company is responsible for the food and lodging. In the course of installation, if there are some stops because of the first party, the A company will take responsibility and should pay the wage loss at 500RMB/person/day. The installation fees will be paid in the form of RMB in Shanghai. The above price is just for reference. And the actuall price should be according to the contract.

153 评论(15)

溪爱Mr彬

The quotation above includes auxiliary material installation, assembling, conveying the goods from downstairs to the room. The project of 200suits cabinets will be accomplished within one year, and that needs 16 erectors, 1 stylist knows English, 3 cargadors. Fees for Visas, roundtrip air tickets, insurance, safety, meals and residence of workers will be bared by A trade company; if there will be halt during the installation due to the first party, which may result in the project delayed, the responsibility will be taken by A trade company, as well as paying for the missed working time for 500RMB each person each day. The fee for installation may be paid in term of RMB in Shanghai. The quotation above for reference only, obeying to the contract.

239 评论(8)

ERICA漠漠

建议你去网上找一个pi的模板。就按照那个做就可以了。

91 评论(14)

天下武功2016

Price above include the installation of accessories. Assembled. Downstairs to the room to move goods. Installation of 200 sets of cabinets. Period of 1 year 16 workers to install, designers were able to speak English 1, 3 porters. Identification of workers, round-trip air tickets. Insurance. Security. A trade room and board by the company, during the installation process caused by the installation of Party A cease. Extension of all the responsibility from A trade is responsible for. A trade by the loss of working time fee to pay 500 yuan / person / day RMB. installation fee paid in RMB in Shanghai. The above quote is for reference only to the contract shall prevail简单的修改下了语法。

239 评论(14)

阿尔卑斯1013

QUOTATION SCOPE:1.The quotation without cost of civil engineering works,primary power source,water inlet and drainage project.2.If the Buyers need domestic invoice,please add 6% tax PLACE OF DELIVERY:TIME OF DELIVERY:PAYMENT TERMS:1.down payment the Buyers should pay 40% of the total amount.2.When goods delived to the Buyers' factory,the Buyers should pay 30% of the total amount.3.finish installation the Buyers should pay 20% of the total amount.4.acceptance test,the Buyers should pay 10% of the total amount.THE BUYERS COMPANY SIGNED&SEALED:THE SELLERS COMPANY SIGNED&SEALED:

271 评论(8)

相关问答