• 回答数

    4

  • 浏览数

    241

tonyxiaozb
首页 > 英语培训 > 处理意见英语翻译

4个回答 默认排序
  • 默认排序
  • 按时间排序

石语angeline

已采纳

Product modelThe client's namePlanBatch quantity samplingSoftware version inspection date full inspection sampling planQualified quality level (AQL) major defects (MA) secondary defects (MI)In accordance with the law, the general GB2828-2003 inspection level II.Check for examination by level in check and let not good fruit processing results to fruitCausal analysis:Treatment:Rework results:The date of signing /Prepare noteOnce the sampling plan - normal examinationWith strict examination once - sampling planCheck the sampling plan - relaxInspection and check, packaging checks. Performance

处理意见英语翻译

289 评论(8)

地主李东家

He gave(gives也可) me some suggestions about how to deal with the problem.

353 评论(13)

茵茵一夏

He gaveme some suggestions on how to deal with the problem.

269 评论(8)

框框拆拆远行车

Product Model Customer Name Plan No. single Bulk sample of a few Inspection date version of the software seized the entire sampling program AQL (AQL) major defects (MA) minor defects (MI) In accordance with the "GB2828-2003", the general inspection level II requirements. Check the level of testing the contents of the test results a few bad results to determine the outcome of treatment Analysis: Deal with observations: Rework Results: Signed forward / date Remarks □ normal check sample program □ tightened inspection of a sample program □ relax a spot check program Appearance inspection, performance inspection, packaging inspection

134 评论(9)

相关问答