• 回答数

    2

  • 浏览数

    262

TATA木门韩林
首页 > 英语培训 > 简明建筑英语翻译

2个回答 默认排序
  • 默认排序
  • 按时间排序

stella1135

已采纳

1, Mao stone wall built on the basis of the original soil were asked, if an individual basis in the backfill, Need to backfill all clear, stone with lime mortar to deepen the basis of gross irrigation. Because of the foundation is located on expansive soil, and should immediately after excavation foundation masonry or water under the column with 100 or 200 thick C10 concrete stone thick cushion. 2, Mao with M5.0 mortar masonry wall, unearthed stone with flat hair, flat hook 1:3 cement mortar joints, top of the wall with a concrete ring beam and column base C20, reinforced with Grade Ⅰ, the upper walls with M5.0 mortar masonry, double-sided water, puree pointing. 3, galvanized corrugated iron Piva size limitation, as far as possible procurement thick, fixed to the wooden stringers tile according to local practice on each tile Xu Yong fixed 9:00, nail brush rust holes, rust, and blocking leakage. 4, gutters and underground drains are 0.5% longitudinal. 5, brush wood tung oil 2 cooked, iron brush rust 2.

简明建筑英语翻译

173 评论(10)

落落晓婷

architecture\ build\ construction\ in the construction of其实你可以在"爱词霸 在线词典"中找到中英文翻译.比你在这里问别人要方便和快得多.

114 评论(15)

相关问答