龙宝宝lovyle
保单[bǎo dān]的英文:warranty; guarantee slip; insurance policy。1、insurance policy英 [inˈʃuərəns ˈpɔləsi] 美 [ɪnˈʃʊrəns ˈpɑlɪsi] n.保单;保险单2、warranty英 [ˈwɒrənti] 美 [ˈwɔ:rənti] n.保证,担保;[法](商品等的)保单;根据,理由;授权,批准3、guarantee slip英 [ˌɡærənˈti: slip] 美 [ˌɡærənˈti slɪp] [法] 保单保险单(Insurance policy)简称为保单,是保险人与被保险人订立保险合同的正式书面证明。保险单必须完整地记载保险合同双方当事人的权利义务及责任。
WJH卡琪屋
CIF贸易术语简介:1、定义:CIF是COST,INSURANCE,ANDFREIGHT(…..NAMEDPROTOFDESTINATION)三个单词的第一个字母大写组成,中文意思为成本加保险费加运费。(指定目的港),指当货物在装运港越过船舷时,(实际为装运船舱内),卖方即完成交货。货物自装运港到目的港的运费保险费等由卖方支付,但货物装船后发生的损坏及灭失的风险由买方承担。2、适用运输方式:海运和内河运输,贸易国(货物最终运抵的海港或河港)。3、关键点:风险点、交货点在启运港船上,费用划分点至目的港港口船上。4、卖方的主要义务A、在合同规定的期限内,在装运港将符合合同的货物交至运往指定目的港的船上,并给予买方装船通知。B、负责办理货物出口手续,取得出口许可证或其他核准证书(原产地、商检证书等)C、负责租船或订舱并支付到目的港的海运费。D、负责办理货物运输保险,支付保险费。E、负责货物在装运港越过船舷为止的一切费用和风险。F、负责提供商业发票,保险单和货物已装船提单等。5、买方的主要义务A、按合同规定支付价款。B、负责办理进口手续取得进口许可证或其他核准书。C、负担货物在装运港越过船舷后的一切费用和风险。D、收取卖方按合同规定交付的货物,接受与合同相符的单据。6、实际业务中的注意点A、概念上的误区:CIF和FOB,术语中交货点及风险点都是在装运港的船上,卖方在装运港将货物安全地装到船上即完成卖方义务,装运后货物可能发生的风险,卖方不再承担责任。卖方将保险单、提单等交由买方,风险索赔等就由买方去办理。B、订舱配载:CIF条件下卖方自主订船,选择船公司货代,自付运费,码头费等,一般不接受买方指定的货代/船公司等,实际业务中客户会选择国外服务较好的马士基、APL等知名船运公司,一般在和买方确认好运费,船期后也可以接受,但一般不可以由买方指定的货代出运。C、卖方在装运港办理保险,一般在订立合同时具体规定保险金额,保险险别和适用保险条款,以及保险责任的起讫期限,选择协会或中国保险条款,保险单银行交单时要背书转让给买方。D、卸货费用:码头作业费等,CIF中一般用PORTTOPORT即港至港条款,启运港的费用由卖方承担,目的港的费用则由买方承担。E、装船通知以及货物的中转、到港日期等。
扩展阅读:【保险】怎么买,哪个好,手把手教你避开保险的这些"坑"
招妹0916
我晕哦,你找错地方了啊我给你个财险险的英文保单,自己研究吧SCHEDULEPolicy No.1. Name of the Insured:Address of Applicant:2. Name of the Insured:(1) The Principal:(2) The Contractor:(3) The Sub-contractor(s):(4) The Other Party(ies) Concerned:3. The Title of Contract/ Project:4. The Site of Construction:5. Insured Items and Sums Insured/Limits of IndemnitySection I: Material Damage(1) Insured Items Sums Insured DeductiblesContract Works (permanent and temporary work, including all materials to be incorporated herein)Contract Price:Materials or Items Supplied by the Principal(s)Erection Work:Construction Plant and Equipment(according to the attached list)Removal of Debris:Professional Fees:Total Sum Insured under Section I:Premium Rate:(2) Limits of Indemnity for Special RisksRisks Limits of Indemnity(1) Earthquake, Tsunami:(2) Flood, Storm, Tempest:Section II: Third Party LiabilityLimits of IndemnityBodily Injury: (Limits of Indemnity per person A.O.A.*)Property Damage:In Aggregate during the Period of Insurance:Premium Rate:* The words “A.O.A. (ANY ONE ACCIDENT)” shall mean any one accident or series of accidents arising out of one event irrespective of the number of claims that may arise therefrom.6. Deductibles:(1) Applicable to Property Damage Under Section I:(2) Applicable to Property Damage For Special Risks:(3) Applicable to Property Damage Under Section II:7. Period of Insurance(1) Construction Period: months, from toincluding days testing and commissioning(2) Maintenance Period: months, from to8. Premium:Total Premium:9. Date of Payment:10. Jurisdiction:11. Special Agreement/ Remark:12. Special Provisions:I. SECTION I - MATERIAL DAMAGE1. SCOPE OF COVER1.1 The Company shall indemnify the Insured in respect of the physical loss of or damage to the property insured during the period of insurance within the specified worksite arising from any NATURAL HAZARDS or ACCIDENT other than those specifically excluded , in the manner and to the extent hereinafter provided.1.2 The Company shall also indemnify the Insured for the necessary cost specified in the Schedule and incurred following upon any event giving rise to a claim under this Policy.1.3 The liability of the Company in respect of each item insured shall not exceed the sum set opposite thereto specified in the Schedule nor the limit of indemnity specified in the Special Provisions or Endorsements where applicable. But in no case shall the maximum indemnity liability of the Company in respect of material damage under this section exceed the total sum insured specified in the Schedule.DefinitionsThe words "NATURAL HAZARDS" shall for the purpose of this Policy, mean earthquake, tsunami, thunder-and-lightning, hurricane, typhoon, tornado, storm, tempest, flood, inundation, frost, hailstorm, landslide, rockslide, avalanche, volcanic explosion, subsidence of ground and any other phenomena of nature with strong destructive power and beyond human control.The Word "ACCIDENT" shall for the purpose of this Policy, mean any unforeseen, uncontrollable and sudden occurrence event which leads to material damage or bodily injury, including fire and explosion.2. EXCLUSIONSThe Company Shall not be liable for:2.1 loss or damage and expenses arising from faulty design;2.2 loss of or damage to the insured property itself or expenses arising therefrom due to wear and tear, inherent or latent defect, change in substance, spontaneous combustion, natural heating, oxidation, rust and corrosion, leakage, mice, insects or vermin, change in atmosphere (climatic or temperature) conditions, change in normal water level or any other progressively operating cause;2.3 loss of or damage to the insured property itself due to defective material or bad workmanship and expenses incurred for replacing, repairing or rectifying such defects or mistakes;2.4 loss of or damage to the insured mechanical or electrical devices not due to exterior forces; loss or damage due to breakdown or derangement or engineering tools, equipment or mechanical devices;2.5 expenses of maintenance or upkeep or normal overhaul;2.6 loss of or damage to files, documents, account books, bills, cash, securities, charts, data and packing materials;2.7 shortage discovered at the time of taking an inventory;2.8 loss of or damage to vehicles, ships or aircraft licensed for general transport use or having been covered by any other insurance;2.9 unless otherwise agreed by the Company in writing loss of or damage to the property belonging to the Insured which is existing or formed within or in the vicinity of the site before the commencement of the contract work;2.10 unless otherwise agreed by the Company in writing loss of or damage to any part or parts of the property insured for which a certificate of completion has been issued or which have been tested after completion or actually occupied or put into service or taken over by the Principal before the expiry date of this Policy.II. SECTION II - THIRD PARTY LIABILITY1. SCOPE OF COVER1.1 The Company shall in the manner hereinafter provided indemnify the Insured against such sums which the Insured shall become legally liable to pay as damages in respect of death of or bodily injury to or illness of third parties, or loss of or damage to property belonging to third parties in consequence of an accident occurring in direct connection with the performance of the contract work insured and happening on or in the vicinity of the site during the period of insurance.1.2 In respect of any claim covered under this Section, the Company shall in addition indemnify the Insured against the relevant legal costs payable by the Insured and other expenses incurred with the prior written consent of the Company.1.3 The indemnification made by the Company for any one accident shall be subject to the amounts to be payable by the Insured which are decided in accordance with the law by the court or the governmental department concerned.Provided always that the liability of the Company under this section shall in no case exceed the limits of indemnity for any one accident stated in the Schedule, and during the whole period of insurance, the maximum liability of the Company under this section shall in no case exceed the limit of indemnity in aggregate as stated in the Schedule.2. EXCLUSIONSThe Company shall not be liable for :2.1 loss or damage and expenses covered or coverable under Section I of this policy;2.2 loss of or damage to any property, land or structure caused by vibration or by removal or weakening of support and injury or damage to any person or property occasioned by or resulting from any such loss or damage;2.3 liability arising from2.3.1 death of or bodily injury to or illness of the Principal(s) or the Contractor(s) or any other party (ies) or their employees or workmen engaged in connection with the contract work on the site , or members of their families;2.3.2 loss of or damage to property belonging to or held in care, custody or control of the Principal (s) or the Contractor (s) or any other party (ies) concerned or their employees or workmen;2.3.3 any accident caused by vehicles, ships or aircrafts licensed for general transport use;2.3.4 indemnification or payment made by the Insured in accordance with any agreement between the Insured and other parties, unless such liability would have been attached to the Insured notwithstanding such agreement.III. GENERAL EXCLUSIONSThe Company shall not indemnify the Insured under this Policy in respect of loss, damage expenses, or liability directly or indirectly caused by or arising out of or aggravated by:1.1 war, warlike operation, hostilities, armed conflicts, terrorism, conspiracy insurrection, coup d'etat;1.2 confiscation, requisition, destruction or damage by any action or order of any government de jure or de facto or by any public authorities;1.3 strike, riot, civil commotion;2. intentional act or gross negligence of the Insured or his representative;3. nuclear fission, nuclear fusion, nuclear weapon, nuclear material, nuclear radiation and radioactive contamination;4. pollution of any kind or description whatsoever such as atmosphere, land and water pollutions;5. cessation of work whether total or partial;6. consequential loss of any kind or description whatsoever including penalties, losses due to delay or loss of contract;7. the deductibles stated in the Schedule to be borne by the Insured.IV. SUM INSURED1. It is a basic requirement of this insurance that the sums insured stated in the Schedule shall not be less than:1.1 For erection work-the full value of the insured project at the completion of the construction including cost of equipments, materials, construction and erection freight and premium, customs duty, any other dues and expenses, and the cost of materials of equipments supplied by the Principal;1.2 For construction plant and equipment-the replacement cost of the insured items by new ones of the same size and same capacity;1.3 For other Items Insured-the sums agreed upon between the Insured and the Company.2. If the sum insured in respect of contract work is based on the estimated contract value stated in the construction contract , the Insured shall:2.1 immediately notify the Company in writing if the contract value including all expenses under this insurance exceeds the original insured contract value due to rise in price or increment, and the Company shall then adjust the sum insured accordingly;2.2 keep a precise record in writing on the particulars of the work concerned during the period of insurance and allow the representative of the Company to inspect and examine such record at any reasonable time;2.3 if the construction period of the insured project is longer than thirty six (36) months, declare to the Company at an interval of every twelve (12) months from the inception date of the policy, the actual amount of fund put into the project by the time of declaration as well as the new estimate contract value, if it is revised the Company shall adjust the premium accordingly;2.4 provide the Company with the actual final contract value within three (3) months after the expiry date of this insurance, and any difference between the premium paid in advance and that payable shall be paid to or refunded by the Company as the case may be.Otherwise, the Company shall take it that the Sums Insured are less than the amounts required to be insured and in case of loss or damage falling within the scope of cover, the indemnification shall be made proportionately according to the Provision (6) of the General Conditions of this Policy.V. PERIOD OF INSURANCE1. Material Damage and Third Party Liability Insurance during the construction Period.1.1 The liability of the Company shall commence notwithstanding any date to the contrary specified in the Schedule, directly upon commencement of the project or after the unloading of the insured materials or equipments at the site and shall expire immediately after a certificate of completion has been issued for part or whole of the insured project or part or whole of the insured project has been tested after completion or actually occupied or put into service or taken over by the Principal, whichever is the earlier. In no case shall the effective date be earlier or expiry date be later respectively than both dates specified in the Schedule.1.2 Notwithstanding anything to the Contrary contained in the contract concerned, the Company shall only be liable for loss or damage, expenses and liability caused or incurred by testing or commissioning arising during the testing or commissioning period stated in the Schedule. In the case of using second-hand items or equipments, the insurance to such equipment shall, however, cease immediately on the commencement of the test.1.3 Any extensions of the period of insurance shall be subject to the Company's prior consent in writing. Otherwise, the Company shall not be liable for any loss or damage, expense and liability arising during the period from the expiry date of the construction period stated in the Schedule to the expiry date of the maintenance period specified below.2. Material Damage Insurance during the Maintenance PeriodThe period of insurance, being subject to the maintenance period specified in the insured contract , shall commence at the time when a certificate of completion has been issued for part or parts of the insured project or part or parts of the insured project have been tested after completion or actually occupied or put into service or taken over by the Principal, whichever is the earlier. It is however provided that, under no circumstances shall such period go beyond the maintenance period stated in the Schedule.
优质英语培训问答知识库