• 回答数

    6

  • 浏览数

    322

雨林之声
首页 > 英语培训 > 排气管英文

6个回答 默认排序
  • 默认排序
  • 按时间排序

小淘淘0312

已采纳

可以告诉你的是全部都是用机器翻译的%!!

排气管英文

297 评论(13)

狐狸的小屋

之-前-在—这-搞一过-个 94 ️ 1297 ️ 345 ️−这️−是️−Ǫ-龙我是电子信息科学与技术,我们主要学习电路分析,模电、数电、高频电路、电磁场、数字信号处理、通信原理、微机原理、单片机等等,会有很多实验,像光学,电学,最多的是电方面的,基本上每科专业课都会有实验,毕业后可做通信方面,或者单片机编程,或者电路设计等等。

136 评论(14)

太仓站沈

Luanhe thermal power plant 2×300MW units are new ones. 100% of condensate water is polished, by High tower seperation technique and ammoniated operation. In the debug, it's found that there are lots of anion resins in cation resins when cation resins are transferred in spt. This results in bad regeneration in mixed resin bed and unqualified water quality. So ammoniated operation cannot be carried out. This article discusses deeply about the reason why cation resins are mixed with anion resins when transferred in spt, compares the feasible solutions and chooses the best one. This solution is carried out in condensate polishing in Luanhe power plant. It performs well and lay a solid foundation for the secure operation of condensate polishing, even of the whole plant.5.17 The sealing of prunace should be rigorous. Water seal of slag scraper machine can be launched after boiler proper being heat-preserved. All ari&flue gas damper can be closed. Examination hole, man hole, gas pass, air duct, water seal of slag scraper machine and so on, should be provided with sealing condition during chemical cleaning. So as to reduce loss of heat, and avoid the decrease of heating up speed, which will affect the quality of chemical cleaning. Thermal insulation should be carried out when pipe and steam pipe are cleaned temporarily. 5.18 Generally, the boiler is provided with condition of firing up. So as to ensure that it can be fired up and flushed in 20 days after the chemical cleaning. 6 Temporary system installation and temporary measures in chemical cleaning 6.1 The exit pipe above the steam drum should be always up and up to the air at last. The effective discharge area of exit pipe should be no less than φ100. 6.2 The cyclone separator in the steam drum should be dismanted or uploaded and be well treated before acid washing, then be loaded after chemical cleaning. 本人一向鄙视机译,不知道底楼的结论从哪来。有能耐你也给个手译的来。

300 评论(9)

qq小妹头

意思Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation. Two 5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work. 5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe. 6 chemical cleaning of the provisional system installation and implementation of interim measures 6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100. 6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.

235 评论(11)

一首ciao情歌

凝结水精处理 condensate polishing 树脂 resin 输送 transfer氨化运行 ammoniated operation火电厂 thermal power plant阴树脂 anion resins阳树脂 cation resins高塔法 high-tower separation technique树脂分离塔 spt混床 mixed resin bed再生 regeneration水质 water quality

253 评论(10)

都市月亮飘飘

英文 汉语含义ARM ROCKER 气门摇臂BEARING SET CKSHAFT 曲轴轴承套件BEARING SET CROD 连杆轴承套件EELT TIMING 正时皮带BOLT CONNECTING ROD 连杆螺栓BOLT TLANGE 水泵固定螺栓BODY AIR ClEANER 空气滤清器壳体BOOT PUMP PLUNGER 化油器加速泵活塞

154 评论(15)

相关问答