• 回答数

    8

  • 浏览数

    231

矩阵时差
首页 > 英语培训 > 喂料英文

8个回答 默认排序
  • 默认排序
  • 按时间排序

尚居装饰

已采纳

Abstract: Strip rolling, the general finishing should be carried out so as to adjust the mechanical properties of steel to improve the quality of the metal strip to the needs of users by the size and quality requirements, and follow-up processing for the strip to provide bedding. In this paper, for the 1700 hot strip finishing equipment before trimming shear Pinch edge of the main drive roller design, from feeding on the role of cutting edge. The adoption of a given design parameters: the maximum speed steel 60m/min, steel plate thickness 2.5mm ~ 12.7mm, the adoption of their ways and drive down the merits of analysis, the first pinch roller system to determine the total program for dual-stick drive on Pinch-type pressure roller roller; and then through the security, economic, reliability and so on consideration of the establishment of a comprehensive program of its main drive system; through the actual conditions of use as well as the choice of motor load and the total transmission through the transmission system design reducer; finalize the attachment transmission model and parameters, thereby completed before trimming shear Pinch Roll main drive system design. Keywords: Pinch Roll cutting edge finishing the main transmission你看行吗

喂料英文

85 评论(9)

小丫夏夏

Strip rolling, the general finishing should be carried out so as to adjust the mechanical properties of steel to improve the quality of the metal strip to the needs of users by the size and quality requirements, and follow-up processing for the strip to provide bedding. In this paper, for the 1700 hot strip finishing equipment before trimming shear Pinch edge of the main drive roller design, from feeding on the role of cutting edge. The adoption of a given design parameters: the maximum speed steel 60m/min, steel plate thickness 2.5mm ~ 12.7mm, the adoption of their ways and drive down the merits of analysis, the first pinch roller system to determine the total program for dual-stick drive on Pinch-type pressure roller roller; and then through the security, economic, reliability and so on consideration of the establishment of a comprehensive program of its main drive system; through the actual conditions of use as well as the choice of motor load and the total transmission through the transmission system design reducer; finalize the attachment transmission model and parameters, thereby completed before trimming shear Pinch Roll main drive system design

243 评论(12)

恶魔小郡主

非专业人士,仅供参考,且原文有笔误=============================================================全套生产线(滤尘室机器、梳理机、并条机)滤尘室生产线——滤尘室机器规格 (使用全棉,或者棉、人造纤维混合物,纤维长度 22-40mm 【应该是staple】)生产线包含:1-自动拆包机2- 倾斜式清洁器,(5),滚筒,带压缩机【或者电容器用于储电?或者是冷凝器】3-水平拆包机【?】4-2个打棉机5-打棉机生产率不低于 800 kg/hr 千克/每小时6-气动式重物分离器和电子式金属分离器7-分离异物的安全性与可靠性必须在产品设计中得到考虑8- 滤尘室机器与梳理机之间的 斜槽进料器,需带有探火、防火系统 【m/c=machine】9-对3技术员进行2星期培训梳理机每台机器需带有:1-全集成式 进料器(直接进料)带触摸屏的电脑控制器3- Long and short term (auto leveller)【?长短期平整器?】4-梳条支数 (0.150 – 0.300) Nm5-生产率不低于130kg / hr6-机器数量:107-对3技术员进行2星期培训并条机:第一阶段并条第二阶段并条规格:1-每阶段投料端 (6-8)2- 每台机器传送带数=2 【?传送带是conveyor belt】3-每阶段通风系统 4over 4 【?over 4 可能是多于4个】4-梳条支数输出 0.180 Nm – 0.40 Nm5-每台机器输出速度800m/min 米/分钟6-每阶段机器数量 =47-第二阶段必须包含下列设备: A-自动平整器 B-微电脑设备,用于控制机器调整和梳条品质8-对3技术员进行2星期培训全套生产线(滤尘室机器、梳理机、并条机)需包含如下附件:运送风机, 除尘风机,装梳理机并条机的容器,其他附件,及够两年使用的备件。The product of this line must be not less than 1500 kg / hr in average count of sliver form II stage of draw frame 0.230 Nm.【有误。生产线的生产力不低于1500 kg / hr。平均。第二阶段并条的梳条支数 0.230 Nm】供应商有完成安装、保证正常运行、培训之职责。

352 评论(15)

密室娱乐小伙伴

1、不要泄露你的秘密。2、不要没事惹事,自找麻烦。3、同类不相残,同室不操戈。

259 评论(14)

月影星云

全系列(滤尘室、梳理和绘图机)。 * * * * * * * * * * * * * * * SPECIFTIONS线的房间,房间的机器 采用纯棉或混合和人造纤维, 稳定的长度22 - 40毫米 这个线条组成:-) 1 -自动包的首场比赛 2 -斜清洁剂(5)滚筒和冷凝器 3 - Horizental开幕战 4 - 2 scutchers 5 -产率为每scutcher不低于800公斤/小时 6 -气动力沉重的一部分与电子五金分离器分离 7 -分开的安全可靠的外国学生必须采取分开考虑管道设计中 8 -槽机之间的m / c滤尘室,卡米/ c提供火灾探测与保护系统 9 -训练三个技术为两周 MACHNES *卡 每台配置:-) 1 -充分整合簇直接提供给料)。 计算机控制screen-2 3 -长期及短期(自动)。 4 -银数=(0.150 - 0.300)海里。 5 -产率不低于130kg每台机器 6 -数量的机器= 10 7 -训练三个技术为两周MACHNES总结。 我的画帧 第二阶段的画帧 规格: 1 -喂食结束(6 - 8)对于每一个阶段 2 -的数目为每台机器传递= 2 3 - 4 4over选秀制度。 4 -银数Deliverry = 0.180海里- 0.40海里 5 -发货速度为每台= 800米/分钟 6 -数量的机器为每个阶段4例 7 -第二阶段应包括下列设备 一个-汽车追平比分 B -微型计算机为控制机器的调试和品质的条子 8 -训练三个技术为两周 * * * * * * * *(房间、卡片、拉丝机)必须有额外的设备 如:- 尘风机、风机、运输和罐子卡机和另一帧配件和备件已有两年了 这条线的产品应不少于1500公斤/人力资源在平均数的条子的形式吸引0.230框架II纳米数量级。安装、操作和培训责任的供应商

327 评论(14)

司令来拉

Complete line (blow room, carding and drawing machines) 完美的流水线(飞纱间、梳理和抽丝机)* BLOW ROOM LINE – SPECIFTIONS OF BLOW ROOM MACHINES飞纱区域线—飞纱间清单 Using 100% cotton or blending with man – made fibers, 用100%的棉纱或人工纤维混合纱Stable length 22-40 mm稳定长度22-40 mmThe line consist of :-流水线包括:1- Automatic bale opener 自动包装捆开启机2- Inclined cleaner ( 5) rollers with condensers配有电容器的倾斜清洁器(5) 滚筒3- Horizental opener 水平开启机4- Two scutchers两个打棉机5- Production rate for each scutcher not less than 800 kg/hr每台打棉机的生产率不低于800公斤/小时6- Aero dynamic heavy part separator with electronic metal(motor) separator 带有电动脱脂器的空气动力重分离脱脂机7- The separate safety and reliably separates foreign materials must be take in consideration during duct design 分隔保险和可靠的不同进口原料在输送管设计期间必须纳入考虑8- Chute feeder between blow room m/c and card m/c supplied with fire detection and protection system 手控飞纱间与手控梳理机之间的送料槽配有火警和保护系统9- Training three Technical for two weeks 训练机修工两周*CARD MACHNES 梳理机 Each machine supplied with:-每台机器配有:1- Full integrated tuft feeder (direct feed)整个花色毛纱喂料机。2 -Computer control with touch screen 带有近距离监视屏幕计算机控制3- Long and short term (auto leveller) .长短期自动校平机4- Sliver count = (0.150 – 0.300) Nm . 纱条数= (0.150 – 0.300) 纳米5- Production rate of each machine not less than 130kg / hr每台机器生产率不低于130kg /小时6- number of machines = 10 机器数=107- training three technical for two weeks 训练三名机修工两周 DRAW FRAME MACHNES :并条机I stage of draw frames 并条机的等级II stage of draw frames并条机的等级SPECIFICATIONS:-说明书 1- Feeding ends (6-8)for each stage 每一级送料径纱((6-8))2- The number of the delivers for each machine =2 每台机器的传送数=23- Draft system 4 over 4 for each stage .每一等级的吸沙系统为4或高于44- Sliver count Deliverry = 0.180 Nm – 0.40 Nm纱条传送计数= 0.180 纳米 – 0.40 纳米5- Delivery speed for each machine = 800m/min每台机传送速度= 800米/每秒6- Number of machine for each stage = 4 每一等级机器数=47- the second stage must be include the following equipments 二等机必须包括以西设备A – Auto leveller自动校平机B – Micro computer for controlling the adjustment of the machine and the quality of the sliver 控制机器调节和纱条质量的微电脑8- Training three technical for two weeks 培训三名机修工两周*THE LINE (BLOW ROOM , CARD, DRAWING MACHINE)MUST BE HAVE ADDITIONAL EQUIPMENTS流水线(飞纱间、梳理和抽丝机)必须具备附加设备。LIKE:- 流水线Transport fan, dust fan, cans for card and draw frames machines and another accessories and spare parts for two years 传送鼓风机,梳理纱条筒和抽丝机以及其他附件机器两年的备件。The product of this line must be not less than 1500 kg / hr in average count of sliver form II stage of draw frame 0.230 Nm. Erection , Operating and training are responsibility of supplier本流水线的产品从II级并条机0.230 纳米平均计数必须不低于1500 kg /小时,运行并训练时供货方的职责。请仔细核对原文,打错的地方不少,用原文重新核对一下译文。

342 评论(14)

小葛先森

全套(吹室,梳理,并提请机) *爆破室线- SPECIFTIONS吹塑机室                                                                                    使用100 %棉或混纺与男子-作出纤维, 稳定长度22-40毫米该生产线包括: - 1 -自动包揭幕 2 -斜清洁( 5 )辊与冷凝器 3 -横向揭幕 4 -二scutchers 5 -生产率为每清棉机不低于800公斤/小时 6 -航空动力重型部分分离电子金属分离器 7 -独立的安全和可靠的隔离外国材料必须采取期间审议管设计 8 -丘特直属打击房间之间米/ C和卡米/炭提供火灾探测和保护系统 9 - 3个技术培训为期两周 *发卡MACHNES 每台机器提供了: - 1 -全集成绺直属(直接供稿)  计算机控制的触摸屏- 2 3 -长期和短期(自动平) 。 4 -银伯爵= ( 0.150 - 0.300 )扭矩。 5 -产率每台机器不少于一三〇千克/小时 6 -多台机器= 10 7 - 3个技术培训为期两周  调匀MACHNES : 余阶段提请帧第二阶段提请帧规格: - 1 -喂料结束( 6月8日)的每个阶段 2 -的人数提供的每台机器= 2 3 -草案系统4over 4每一阶段。 4 -银伯爵Deliverry = 0.180牛顿米- 0.40牛顿米 5 -传递速度为每台机器= 800m/min 6 -数机器的每一阶段= 4 7 -第二阶段必须包括下列设备阿-自动平乙-微型计算机控制的机器调整和质量的条子 8 - 3个技术培训为期两周 *在线(爆破室,卡,拉丝机)必须有额外的设备如: - 运输风机,除尘风机,罐的卡和借鉴帧机器和另一配件,备件两年该产品本林

205 评论(9)

天天开心好好好

Plastics 塑料Compression Molding for Plastics 传递模塑法Transfer Molding and Injection Molding 压缩模塑和喷射造型法Pressure Die Casting Dies 压铸Forging Die 锻模Fundamental of Chip-type Machining Processes 基本粉碎型机工Fundamental of Turning and Boring on Lathe 不知道Milling 轧齿边Smith forging 锻造炉Electrodischarge Machines 电镀机external cylindrical and conical surfaces. 外观 圆柱和锥形面third dimension 三维立体感feed, compression, and metering(定量)喂料(放料),压榨,测定或定量

123 评论(10)

相关问答