At present, most of the projects are in the design of short-cycle, time, urgent task, by strengthening the working drawings at the design stage of project implementation, as well as the depth of the design process of design services at a later stage to make up for the preliminary design of a number of shortcomings in the document, after all, a M In addition, the construction and construction units in accordance with their years of experience in on-site views and suggestions should be accepted with an open I hope that in practical work experience to the point of the colleagues with a train of thought for