ComposAI 在线语法/拼写检查软件**你的英语写作助手Cai 检查语法的例句:*方括号内是错误部分, 圆括号内是修改建议 The new [metod] is [effective] than the old (method, more effective) The children loved [there] (their) Good policemen require three [quality]: courage, tolerance, and [dedicated] (qualities, dedication)
Abstract Reaction wall, anti-power platform for structural Museum in a variety of structural components, structural systems and structural materials of the quasi-static or pseudo-dynamic test of the important For the engineering characteristics, combined with engineering practice, the paper walls of the reaction, anti-power pedestal construction for several key difficult technical discussions are summarized as follows: 1, the number of embedded parts of the project, and the installation of high-precision control is difficult, the paper walls of the reaction, anti-loaded hole edge pedestal embedded parts are designed for a number of auxiliary parts, the use of molds and the installation of a combination of theodolite positioning embedded parts technology program and the overall two-way lock access reinforcement measures to enable the loading of the large number of holes embedded parts can be fast and accurate positioning, and in the follow-up does not offset the construction跑位 2, this works on the concrete surface roughness, verticality of much stricter requirements of regulatory requirements on the acceptance, the template and its support system is very stringent In this paper, a rigorous selection template materials, strengthening of the flatness control template design, template by strict measures to check power to ensure that the formation error control to meet the design 3, reinforcement of the project-intensive, embedded parts, and poor through small gaps on the concrete requirements and must focus on concrete raw materials selection, mix design, construction period of the calculation of the temperature effect, strengthening of concrete from the transport, detection to trace and poured, vibrated, the conservation of the entire process of quality control to ensure that the apparent quality of the concrete to meet design In short, it is necessary to high-quality, high efficiency wall reaction, anti-power pedestal construction task, we must strictly control the construction of part of the error, so technically feasible, management in Key words: construction technology, anti-power wall, anti-power pedestal, loading holes, flatness